Connection Application to the Lower Rontal Water Supply
Gemeinde Root
Root
Key information
- Publication date:29 October 2025
- Workload:100%
- Contract type:Permanent position
- Place of work:Root
Job summary
The application for water supply connection in Root is vital. This is a chance to ensure proper water access for new buildings.
Tasks
- Submit a connection request for water supply per building.
- Provide details on water consumption and required installations.
- Ensure compliance with SVGW guidelines for plumbing installations.
Skills
- Experience in building project management or architecture.
- Strong understanding of water supply systems and regulations.
- Excellent communication and organizational skills.
Is this helpful?
Connection application to the Lower Rontal water supply
(Submit one application per building to the office)
The applicant(s) request connection to the Root water supply network for:
Object:
(Multi-family house, single-family house, residential and commercial building, commercial building; new construction, extension, conversion, etc.)
Parcel No.
Land register Root building insurance no.
(GVL)
Location designation, street, no., possibly building designation:
1. Involved persons / companies (name and first name or company, address)
Applicant / builder:
Tel.
Architect:
Tel.
Sanitary planner:
Tel.
Sanitary contractor:
Tel.
(if known)
Correspondence address:
Builder
Architect
2. Information on the expected water consumption: (according to sanitary planner)
Installations in the building must be carried out according to the W3 guidelines (incl. E3 09/2020) of the SVGW
Request our pressure device!
(mario.portmann@gemeinde-root.ch, +41 79 550 00 86, Mario
Portmann BM)
Normal installations: (e.g. apartments, office, commercial)
Total load values
LU largest individual load value
LU
Number of apartments:
Number of commercial enterprises:
Additional systems:
Rainwater use
Swimming pool
Pressure boosting system additional private water connection
Water treatment system
Special installations: (in addition to normal consumption e.g. continuous or peak consumption)
Max. required volume flow industry / commerce / sports facilities l/s
3
Max. required daily consumption commerce/industry (only if>10m /day) m3/d
Fire extinguishing facilities with water: (according to GVL requirements)
None
Small extinguishing posts (connection line max. DN 32)
Number
Indoor hydrant (connection line min. DN 40)
Number
Sprinkler system: required volume flow l/s
3. Dates:
Expected start of construction:
Commissioning:
4. Remarks:
Lower Rontal Water Supply Platz 1a
T 041 455 56 91
6039 Root D4 mario.portmann@gemeinde-root.ch www.gemeinde-root.ch
5. Documents: (paper form or by e-mail in PDF format)
Connection application signed on all sides
Situation (land register plan)
1:500 500
Floor plans of all floors (with location of distribution battery)
1:100 or 1:50
Section plans
1:100 or 1:50 each
For fire extinguishing facilities with water GVL order
Place:
Date:
Applicant / builder:
Property owner:
Architect / planner: